Let's Work Together
Capital Development offers an exciting opportunity to be part of an innovative effort to transform PHL into a premier global hub. By smartly sourcing and connecting large, small, and diverse businesses to real opportunities, we will achieve our goals, engage the business community and deliver a first-class experience for travelers.
Contracting opportunities will be updated regularly; the tables below are as of April 2024.
Professional Services Opportunities
Quarter 3 - 2024
OPPORTUNITY | DESCRIPTION |
On Call Security & Special Systems Engineering Services |
Provide on-call consulting services related to the security and other special systems on an as-needed basis at Philadelphia International Airport and Northeast Philadelphia Airport. |
Public Works Opportunities
Quarter 2 - 2024
OPPORTUNITY | DESCRIPTION |
Terminal DE Baggage Claim Roof Top Unit(s) Replacement |
Replacement of 21 units in DE Bag Claim RTUs. Also includes installation of Bipolar Ionization units and connect them to the building automation system and upgrades to electrical system as needed to all units. |
Mechanical Room 3BC & 4BC Rehabilitation |
Includes replacement of air handlers inside the MR#3BC and MR#4BC including associated hot water and chiller water piping and pumps and upgrades to electrical system as needed to all units. |
Bridge & Terminal Roof Top Unit(s) Upgrades, Package 1 |
Replacement of air-handling units across multiple terminals and pedestrian bridges. Includes installation of Bipolar Ionization units and upgrades to electrical system(s) as needed. |
Bridge & Terminal Roof Top Unit(s) Upgrades, Package 2 |
Replacement of air-handling units across multiple terminals and pedestrian bridges. Includes installation of Bipolar Ionization units and upgrades to electrical system(s) as needed. |
PNE Administration Building Upgrades |
Improvements to the existing administrative building, including the installation of an ADA accessible entrance and restrooms, as well as a geothermal air conditioning system. |
Terminals B/C & D/E Electrical Panel Replacement |
Replacement of various electrical panels in Terminals B/C and D/E. |
D&E Checkpoint Curtainwall Replacement |
Facade renovations consisting of architectural, structural, civil, and electrical. |
Quarter 3 - 2024
OPPORTUNITY |
DESCRIPTION |
Parking Garage C Renewal |
Garage C restoration includes structural repairs, waterproofing, expansion joint(s), sealant, concrete repairs, exterior envelope, and plumbing systems to include domestic water, heating, fire, sprinkler, and stormwater. |
Terminal F Heated Pavement |
Demolition of existing system and installation of hydraulic piping system including mechanical, electrical, and civil disciplines. |
Primary Substation Improvements |
Upgrades or improvements including replacements of Control Power Transformers (CPT), oil filled transformers, installation of fire suppression systems, replacement of capacitor banks, breakers, etc. |
Departures Road Landscaping Improvements |
Landscaping improvements at Departures Road, South Commercial Road, Pedestrian Bridges, and Baggage Claim areas. |
CCTV Phase 2B |
Installation of an upgraded Video Surveillance System (VSS) within various areas at PHL. |
Grading Tract 14 |
Grading of Tract 14 to include grading, storm drainage, and erosion control. |
Relocate TBA Substation |
Relocation of the TBA Substation to include electrical, mechanical, civil, structural, geotechnical, and architecture. |
Terminal D&E Secure Exit Lanes |
Enhancements such as physical dimension changes, system improvements/replacements, etc. to the existing unmanned gates, including new exit doors with new technologies, improving security while reducing on-going maintenance efforts. |
Quarter 4 - 2024
OPPORTUNITY |
DESCRIPTION |
Multi-User Flight Information Display System (MUFIDS) |
Provide implementation services for MUFIDS at Philadelphia International Airport in accordance with design specifications. |
Terminal E Holdroom Improvements |
Passenger facing upgrades to include new flooring finishes, new ceilings, lighting, wall base, column covers, and electrical upgrades. |
Unit Substation Improvements |
Improvements to eight substations units including main breakers, oil filled switches, personnel doors, ground wires, safety improvements, replacement of security features, etc. |
Terminals A-F Refresh |
Scope includes new ceilings, lighting, wall and column finishes, and new floor finishing. |
Pavement & Grounds Building C |
All trades construction to include an enclosed 8-bay storage shed with overhead doors for large vehicles. |
Terminal LED Upgrades Phase 4 |
Continuation of lighting retro- fit in Concourse A West, Terminal & Concourse A East, A East Hold Rooms, public areas, & AB Connector. |
1918 Sanitary System Upgrades |
Refurbishment of sanitary lift station(s), including replacement/ concrete encased terracotta mains.
|
Northeast Airfield Development-Site Demolition |
This project consists of demolition and site preparation for future facilities and site grading requirements. |
Terminals BC Baggage Claim Roof Replacement |
Replacement of 100,000 square feet of roofing with 2-ply bituminous roofing. |